Plant 12 Elevated Storage Tanks

Connection of the Inlet and Overflow Risers
Installation of the Tank Roof Access Hatches

Project Background

These projects include the design of two elevated storage tanks to replace Plant 3 and the previous Plant 4 (Plant 12).

Project Status

The contractor has completed the ground phase painting of the tank bowl. The tank is expected to be raised on April 30th. 

Construction Cost Estimate: $2,640,381.70

Awarded Contract: $3,127,000.00